Ing. Herbert Kinder
Inhaber, Project Manager, MDW – Engineering and Consulting
Curitiba, Brasilien
Werdegang
Berufserfahrung von Herbert Kinder
Bis heute 13 Jahre und 4 Monate, seit März 2011
Project Manager
MDW – Engineering and Consulting
Partner Business Owner, acting as a Project Manager, working in design and construction for infrastructure enterprises of Energy (Power Plants) and Transportation (Subways, Railways, Ports and Airports), inside others companies.
2 Jahre und 3 Monate, Juni 2014 - Aug. 2016
Contract Manager
EBEI - Brazilian Company of Infrastructure Engineering
Project and Contract Manager of: Studies for the Private Concession of Fortaleza and Salvador Airports for the National Civil Aviation Agency. Civil design, construction, supplies and environmental; planning, physical and financial control and risk analysis for Monorails - lines 15 and 17, Subway - line 4; Subway - line 2 in Sao Paulo/Brazil. Certification contract of the Monorail - line 18 in Sao Paulo/Brazil. Expansion of Line 2 project: Stations, Tracks and Train maintenance yard, for Metrô-SP.
14 Jahre und 5 Monate, Feb. 2000 - Juni 2014
Superintendent of Hydroelectric Power Plants Projects
Intertechne - Consulting Company
Superintendent of qualified Project Managers, responsible for budgets, schedules, quality and interface management between construction companies, manufacturers, assemble companies and investors during construction and enterprise implementation, aligning strategies and optimizing technical and economic results for Small Hydro Power Plants. Contracts Management for the Subway Company of São Paulo State. Technical management for design of equipment’s and auxiliary systems for Hydroelectric Power Plants.
5 Jahre und 7 Monate, Aug. 1994 - Feb. 2000
Mechanical Engineer
COPEL – Companhia Paranaense de Energia
Electromechanical field engineer in the Hydroelectric Power Plant Salto Caxias (1240 MW), during the construction and equipments assembly between 1998 and 2000. Contract management of Turbines, Generators and other equipments to the HPP Salto Caxias between 1994 and 1998; Responsible for the Owners Engineering in the project HPP Dona Francisca (125 MW); Coordination of contracts of electromechanical equipments assembly for the construction of the HPP Rio Jordão Derivation (6,5 MW) and HPP Salto Caxias.
6 Jahre und 7 Monate, Feb. 1988 - Aug. 1994
Mechanical Engineer
ETA – Water Treatments Company
Management of all the equipment’s design and installation of water and wastewater treatments equipment’s. Technical Responsible for the factory and technical assistance.
3 Jahre und 8 Monate, Mai 1984 - Dez. 1987
Mechanical Engineer
EMBRACO S.A.
A member of Research & Development team for new products. Supervision in the factory of the areas: welding, degrease and light machining;
Ausbildung von Herbert Kinder
1 Jahr und 7 Monate, Jan. 2003 - Juli 2004
Business Administration
Federal University of Paraná
5 Jahre, Jan. 1977 - Dez. 1981
Mechanical Engineering
Engineering University of Joinville
Sprachen
Portugiesisch
Muttersprache
Deutsch
Gut
Englisch
Fließend
Spanisch
Fließend