Bernd Heise

ist gesund und munter. 🥦

Angestellt, Projektleiter Bauüberwachung Stuttgart-21 L2a Tunnel/Trog offene Bauw., ILF Beratende Ingenieure

Kirchberg an der Iller, Deutschland

Fähigkeiten und Kenntnisse

Projektmanagement
Projektleiter
Construction Management
Consulting
Bauherrenvertretung
Bauleitung
Bauingenieurwesen
Bauwesen

Werdegang

Berufserfahrung von Bernd Heise

  • Bis heute 5 Jahre und 3 Monate, seit Apr. 2019

    Projektleiter Bauüberwachung Stuttgart-21 L2a Tunnel/Trog offene Bauw.

    ILF Beratende Ingenieure
  • 5 Jahre und 2 Monate, Feb. 2014 - März 2019

    constr. manager / consultant

    ILF Beratende Ingenieure

    Civil and mechanical Site Supervision and Consulting for an Oil and Gas Storage Project located at the borderline to Saudi Arabia at the Gulf of AL Aqaba in Jordan. Consulting and Supervision of the EPCC Contractors and Subcontractors construction activities as part of a 4 member expat team (Constr.M - Civil S. - QA/QC - HSE) on behalf of the Jordanian Ministry of Energy and Minerals

  • 9 Monate, Juni 2013 - Feb. 2014

    project leader

    PPS Pipeline Systems GmbH

    DOW Stade - PE100 RC DA450 - horizontal directional drilling HOLBORN EUROPA RAFFINERIE - refinery shutdown HOLBORN EUROPA RAFFINERIE - renewing LPG-storage

  • 5 Monate, Jan. 2013 - Mai 2013

    expatriate construction manager - Carrico, Portugal

    PPS Pipeline Systems GmbH

    Carrico, Portugal: 1km field piping DN300, x70, line nr. 8202 Transgás Armazenagem - Cavern TGC2. Two road crossings, 5 S-shapes, 2 insulation joints and fixpoints. Additional cavern place piping,

  • 2 Monate, Nov. 2012 - Dez. 2012

    construction manager

    PPS Pipeline Systems GmbH

    Responsible site engineer for the regeneration of an oil-pipeline. Client: RWE Dea AG in Germany. Technical Details: Product pipeline DN150, 100bar, Duplex 1.4462, Cladding tube for leak monitoring DN250, 12bar, Duplex 1.4462, 2x ISO-Flanges, DN400 LOGSTOR plastic jacket pipe with thermo insulation.

  • 3 Monate, Aug. 2012 - Okt. 2012

    construction manager

    PPS Pipeline Systems GmbH

    Responsible site engineer for a gas-storage upgrading project. Client: Public services of city Kiel in Germany. Technical Details: 12 inch pipes ANSI Class 1500lbs, 9 tie in points.

  • 5 Monate, März 2012 - Juli 2012

    project engineer in plant construction

    PPS Pipeline Systems GmbH

    Project engineer for the Acid-Gas-Drying-Station ZGT Hengstlage Client: Exxon Mobil Germany. Location: Hengstlage in Germany

  • 5 Monate, Okt. 2011 - Feb. 2012

    project engineer in plant construction

    PPS Pipeline Systems GmbH

    Project engineer for the Gas-Drying-Station Brettorf Z2b. Client: Exxon Mobil Germany. Location: Brettorf in Germany.

  • 1 Jahr und 9 Monate, Jan. 2010 - Sep. 2011

    project manager division pipeline construction

    PPS Pipeline Systems GmbH

    Client relation, site inspection, tender and budget preparation, personnel allocation, monthly amortization. Clients: Wintershall, Erdgas Münster, Gasunie, GDF SUEZ

  • 10 Monate, März 2009 - Dez. 2009

    expatriate construction manager, Romania

    PPS Pipeline Systems GmbH

    Expatriate responsible site engineer fort the „MAMU-Project” in Dragasani, Romania. Technical details: 3,2km 8 inch acid gas pipeline, 220bar, 3 valve-stations, 2 manifolds, 2 vent-pipes, 2 vent-stacks. Client: PETROM-OMV in Romania.

  • 6 Monate, Sep. 2008 - Feb. 2009

    expatriate supervisor, project manager, Romania

    PPS Pipeline Systems GmbH

    Site inspection, quality and quantity inspection from Romanian pipeline projects. Client: PETROM-OMV Romania. Responsible OMV Director: Mr. Thomas Laaber Senior lead engineer: Mr. Werner Rettberg from PPS Romania. Preparation of a competition analysis about the Romanian pipeline companies. Monitoring, site-inspection, quality- and quantity- /inspection for the different Romanian projects:

  • 1 Jahr und 2 Monate, Juli 2007 - Aug. 2008

    expatriate project manager, Romania

    SC SANDER CONSTRUCT & CONSULTING S.R.L - Rumänien

    Freelancer in Romania: consulting, project- and site management for a Romanian construction company. (Pipe Bridge URSUS Timisoara, Bidding Soufflet Malt Buzau, consulting in general for office and work structures)

  • 2004 - 2007

    project management

    diverse s.u.

    project and site management for: Dipl.-Ing. Heinrich Mühlen (Willich); Friedrich und Lucas (Düsseldorf)

  • 2003 - 2004

    real estate development

    Wilfried Mocken

    Project development for a healthy and business house (5Mio. €)

  • 2001 - 2002

    final planning and construction management

    Architekturbüro Schally

    Final planning and contractor’s manager for live and business house (3Mio. €)

  • 1988 - 2001

    design engineer in architecture and civil eng.

    diverse s.u.

    Freelancer for concrete formwork-, reinforcement-, and final drawings (drawingboard and CAD) for: Dipl.-Ing. Enseling (Mönchengladbach); Dipl.-Ing. Heinrich Mühlen (Willich); Ing. Naschberger und Daub (Waldniel); Dipl.-Ing. Funcke (Essen); Friedrich und Lucas (Düsseldorf)

  • 1994 - 1999

    Honorardozent

    FAA Gesellschaft für berufliche Bildung

    Instructor in Building Industry

  • 1985 - 1987

    Maurer Lehrling (journeyman bricklayer)

    Bauunternehmung Hartwig Hören

Ausbildung von Bernd Heise

  • 2002 - 2005

    Projektmanagement

    Biberach/Riß - University of applied sciences

    Projektmanagement, Projektentwicklung

  • 1998 - 2002

    konstruktiver Ingenieurbau

    Universität-GH Wuppertal;

Sprachen

  • Deutsch

    Muttersprache

  • Englisch

    Fließend

  • Rumänisch

    Fließend

Interessen

Sporttauchen
Badminton
Backgammon
Photographie
Webdesign
moderne Kunst und Baugeschichte

21 Mio. XING Mitglieder, von A bis Z