Stefan Daniel Scarlatache Danciu

Selbstständig, Team Leader, Louis Berger

Bucharest, Rumänien

Fähigkeiten und Kenntnisse

Water Project Management

Werdegang

Berufserfahrung von Stefan Daniel Scarlatache Danciu

  • Bis heute 11 Jahre und 11 Monate, seit Aug. 2012

    Team Leader

    Louis Berger

    Technical Assistance for Project Management – Extension and Rehabilitation of water and wastewater systems in Buzau county. The project consists in support the Beneficiary for implementation management of About 200Km km of water/wastewater networks (rehabilitation and extension), 4 new WWTPS (13000-95000 p.e), extension of 1 WWTP (235000 p.e), 2 new DWTPs (20-25 l/s) and rehabilitation of 1 DWTP (50 l/s).

  • 10 Monate, Nov. 2011 - Aug. 2012

    Deputy Team Leader

    Louis Berger

    Technical Assistance for Project Management – Extension and Rehabilitation of water and wastewater systems in Buzau county. The project consists in support the Beneficiary for implementation management of About 200Km km of water/wastewater networks (rehabilitation and extension), 4 new WWTPS (13000-95000 p.e), extension of 1 WWTP (235000 p.e), 2 new DWTPs (20-25 l/s) and rehabilitation of 1 DWTP (50 l/s).

  • 8 Monate, Apr. 2011 - Nov. 2011

    Project Manager

    Louis Berger

    Technical Assistance - Improvement of water supply systems, sewerage and wastewater treatment in Caras Severin county ISPA Measure - 2005 RO 16 P PE 003. Feasibility Study and Cohesion Funds application for the county of Caras Severin (107 mio E investments). The Project comprises of design of around 350 Km of water/wastewater networks (extension and rehabilitation), 2 DWTPs and 7 WWTPs for 8 human agglomerations. Client/Beneficiary: Local Regional Operator

  • 5 Monate, Nov. 2010 - März 2011

    Design Review Manager

    MVV Decon - Misuratah, Libya

    Construction Management/Construction Supervision for infrastructure networks projects in Shohada Al Remela and That Al Remal districts and one new common WWTP in Al Sikt The project comprises of design and construction of around 2 842 km of infrastructure (roads, water/wastewater networks, storm water drainage, telecommunication network and gas network) and one new Waste Water Treatment Plant for about 150 000 p.e.

  • 3 Jahre und 5 Monate, Juli 2007 - Nov. 2010

    Deputy Project Manager

    MVV Decon

    TA for project preparation in the wastewater and drinking water sector, Romania ISPA Measure 2005/RO/16/P/PA/001-03. Preparation of Master Plans, Feasibility Studies and Cohesion Fund applications

  • 1 Jahr und 4 Monate, Apr. 2006 - Juli 2007

    Designer of Waste Water Systems

    MVV Consulting Bucharest

    TA for project preparation in the wastewater and drinking water sector, Romania. ISPA Measure 2003/RO/16/P/PA/013-05. Hydro-geological in field investigations and preparation of hydro-geological reports. Preparation of Master Plan, Feasibility Study and Design and coordination of local design team in charge with design of waste water networks and WWTPs and CF application.

  • 2006 - 2006

    Design Engineer

    IPCM

    Acting as designer of sewerage system, Waste Water Treatment Plant and water supply system. In a short period spent at this company I was involved in checking calculation notes and drawings for different water/wastewater projects.

  • 2004 - 2006

    Design Engineer

    Xaxira SRL

    Design of sewerage system (25Km) and Waste Water Treatment Plant of Liteni (6000 p.e) - SAPARD program Design of sewerage system (12Km) and Waste Water Treatment Plant of Draguseni (2000 p.e) - SAPARD program

  • 1997 - 2004

    Design Engineer

    S.C. Hidroedil S.A.

    - Design (Feasibility Study and Final Design) of the sewerage system (over 90 Km) and Waste Water Treatment Plants (2000 – 9000 p.e.) - financed by SAPARD program - Design of water supply systems (over 150 Km)- financed by SAPARD program - Feasibility study and Design works for Industrial water supply from drilling and wastewater system

Ausbildung von Stefan Daniel Scarlatache Danciu

  • Bis heute 17 Jahre und 6 Monate, seit 2007

    Project Management

    CODECS, Bucharest - Romania

  • Bis heute 20 Jahre und 6 Monate, seit 2004

    Water quality protection legislation and moderns technologies for waste water tr

    Technical Foundation for environmental protection, Iasy – Romania

  • Bis heute 21 Jahre und 6 Monate, seit 2003

    Antropic impact on surface waters

    Technical Foundation for environmental protection, Iasi – Romania

    Antropic impact on surface waters

  • 1992 - 1997

    Hydro technical constructions

    Technical University “Ghe. Asachi” Faculty of Hydro techniques, Iasi

Sprachen

  • Rumänisch

    Muttersprache

  • Englisch

    Gut

21 Mio. XING Mitglieder, von A bis Z