Stavros Dougalis
Angestellt, Projects Engineer, VIER ATE
Kozani, Griechenland
Über mich
Extended experience in the EPC/EPCM sector with a track of record in Construction management leading to successfully delivering turn-key projects on time, within scope & below budget. Associate Member of the Institute of Mechanical Engineers UK. Dedicated & proficient in managing multi-disciplinary contractors, with a desire to make a difference through strong leadership ability; improving contract profit margin by implementing quality, managerial & cost savings initiatives. Capable multi-lingual communicator, willing to take responsibilities outside his role using direct responsible involvement & a “can do” attitude, gaining experience through internships. Open minded, able to express individual perspective while maintaining a team spirit communications active. Skills: EPC, Project Engineering, Process Improvement, Project Planning, Construction & Coordination Management, Lean Management, Lean 6σ, Complex Problem Solving, Critical Thinking, Cognitive Flexibility
Werdegang
Berufserfahrung von Stavros Dougalis
Bis heute 2 Jahre und 3 Monate, seit Apr. 2022
Projects Engineer
VIER ATE
Bis heute 11 Jahre und 9 Monate, seit Okt. 2012
Mechanical Engineer
Stavros Dougalis
1 Jahr und 1 Monat, Jan. 2020 - Jan. 2021
Mechanical Engineer (NC, USA & Genk, Belgium)
SGS Industrial Services GmbHField Service support ensuring coordination, actions implementation, meeting contractual obligations and setting up reliable operations workload standards. Partner with Project’s Teams to unblock dependencies, provide technical direction and transparency to production teams scope, safeguarding continuity. Identification (RCA) & resolution of non-conformities or deviations from planned and agreed operating conditions. Providing Logistical support to sustain continuous uninterrupted operations.
1 Jahr, Feb. 2019 - Jan. 2020
Mechanical Engineer (660 MW SES Ptolemais Unit V, Greece)
VIER ATE
Managing the prefabrication and Erection of Lubeco Air and Fluegas Ducts and Internal Piping
9 Monate, Jan. 2015 - Sep. 2015
Mechanical Engineer (590MW OCPP Hassi R’Mel II, Algeria)
METKA S.A.
Monitoring & controlling the installation of the GT's Power Train & Aux. Systems implementing schedule & hand-over to Commissioning. Leading the preparation & execution of Lube/Lift oil Flushing, PTs & FATs. Complying with QA/QC requirements by developing sound processes, implementing practices & continuous management. Providing engineering & managerial experience supporting erection of relevant Steel Structures, Pipe Rack & BOP Piping.
2 Jahre und 1 Monat, Okt. 2010 - Okt. 2012
Mechanical Engineer (220MW DPP Nouvelle Centrale EDF, Martinique)
SGS Industrial Services GmbHManaging the Engineering & Logistic activities achieving 100% compliance with project schedule. Leading the technical communication with QA/QC Dept. Setting up effective communications, developing & presenting accurate technical reports. Defining & resolving roadblocks guaranteeing achievement of productivity targets. Preparation of action plans. Leading the development of a multi-skilled team, providing the Project with additional, flexible & motivated workforce.
6 Monate, Mai 2010 - Okt. 2010
Mechanical Field Engineer (830MW CCPP Pego, Portugal)
ATERMON S.A.
Providing engineering, technical expertise & guidance in the identification, analysis & resolution of problems in order to acquire ECCs. Planning, estimating, scheduling & monitoring of production works supporting accomplishment of set goals & objectives. Demonstrating effective oral & written communication skills. Formulating technical documentation, including systems P&ID & ISO red-marks. Developing positive working relationships to effectively coordinate work activities.
1 Jahr und 4 Monate, Juli 2009 - Okt. 2010
Mechanical Engineer - Project Materials Controller (830MW CCPP Pego, Portugal)
ATERMON S.A.
Managing portfolios, reaching adherence to delivery schedules in line with production requirements & reducing supplier lead times. Liaising closely with the QA/QC Dept. & Project Engineers implementing minimal disruption of construction schedule. Developing solid supplier relationships. Planning & providing logistical support, minimising freight costs & obsolescence. Co-ordinating mobilisation of resources for pre/post project & shutdown execution.
2 Jahre und 2 Monate, März 2006 - Apr. 2008
Project Manager
Allan Roofing Ltd.
Cost controlling, invoicing & claim management increasing turnover 61.5% over the period of employment. Planning & monitoring multiple projects guaranteeing standards aren’t compromised even under pressure. Improving performance by efficient resource management. Highest Productivity Award (2006-2007) received. Utilizing engineering & managerial experience to develop team skills and advance working standards and ethics.
1 Jahr und 6 Monate, Apr. 2004 - Sep. 2005
Mechanical Engineer (390MW CCPP Hellenic Petrolium, Greece)
ATERMON S.A.
Overseeing piping prefab & installation for the HRSG, HP/IP/LP & ST Aux. Systems. Setting up Cost Control & CWOs databases, communicating schedules & providing technical information to all Engineering disciplines. Managing BOP design issues, decision making based on technical experience. Issuing of CWOs. Adapting WP & MS, red-marked drawings & P&ID’s according to PED Standards. H&S Advisor with 0 reportable accidents, recommending feasible solutions, leading & commencing trainings on H&S issues.
1 Jahr und 6 Monate, Sep. 2002 - Feb. 2004
Mechanical Engineer (A/G RODOS & Hellenic Navy Fleet Command)
Hellenic Navy
Hands-on duties, maintaining routines on A/C, engine & fire-fight systems under supervision. (A/G Rodos) Introducing innovative approach to document control & technical data. Presenting detailed periodical reports, damage & fuel consumption analysis to Fleet Command. Promotion to FSoB Sector awarded. Fire & Safety on Board (FSoB) Sector engineer, ensuring fire safety, procurement of resources, creating & establishing Cost Control, Logistics & Maintenance databases.
5 Monate, März 2002 - Juli 2002
Mechanical Engineer (Titan Cement Kiln Project, Greece)
METKA S.A.
Developing basic on-site experience by overseeing all aspects of Erection Engineering, Requested hands-on experience on welding, piping and fitting. Improving working environment, maintaining positive morale through employee involvement and communication. Handling of Cost Control & technical documentation, creating production analysis databases to enhance Project's Performance. Project delivered 5 weeks prior to schedule.
9 Monate, Sep. 1998 - Mai 1999
Mechanical & Modification Engineer
Jungheinrich UK Ltd
Redesigning custom orders to Clients requirements, testing & development of innovative patents prior to production. Publishing of technical manuals & performing of tests to verify CE Standards marking of modified equipment & new patents. Developing & maintaining improved data control within the MO Dept. leading to Company’s awarded compliance to BS EN ISO 9001 : 2000.
Ausbildung von Stavros Dougalis
10 Monate, Sep. 2000 - Juni 2001
Energy Technology for Sustainable Development
University of Salford
3 Jahre und 10 Monate, Sep. 1996 - Juni 2000
Mechanical Engineering
Manchester Metropolitan University
11 Monate, Sep. 1995 - Juli 1996
Mechanical Engineering
Vakalis College of Advanced Education
Sprachen
Englisch
Muttersprache
Portugiesisch
Grundlagen
Französisch
Grundlagen
Griechisch
Muttersprache
Deutsch
Grundlagen