Stanko Kacar
Inhaber, P.Eng., PMP, SiGMA-Tex
Toronto, Kanada
Werdegang
Berufserfahrung von Stanko Kacar
Bis heute 22 Jahre und 2 Monate, seit Mai 2002
Project Engineer/Manager
GM-Truck Assembly
• Manage AGV refurbishment project (replacement of DEC-PDP11/73 with PC/PLC based hardware/software) through all phases of life cycle from writing RFP, selecting contractor, negotiating contract, system design, development, testing, implementation and production support . • Manage UAT/SAT (User and System Acceptance Test) and QA testing. Developed testing plans and procedures. • Manage Assembly line expansion project and coordinate cross-functional departments and teams. • Project lead for Plant wide Contr
Bis heute
P.Eng., PMP
SiGMA-Tex
6 Jahre und 9 Monate, Sep. 1995 - Mai 2002
Project Engineer
SiGMA-Tex Inc. Toronto
• Designed Relay Protection Controls Panels and lead integration of Co-Generation plant transmission station with local Hydro SCADA system (New Brunswick ). • Designed, programmed, integrated, commissioned and troubleshooted plant wide controls systems, Including Control Panels, AGV (Automatic Guided Vehicle), assembly line and Vision system related controls. (A-B PLC and Conco-Tellus CAL/Assembler programming…) . • Implemented SCADA, custom Data Collection (Visual Basic based) system, Parts tracking , Tre
Ausbildung von Stanko Kacar
Power Electrical Engineering
Belgrade
High Voltage grid in downtowns
Sprachen
Englisch
Muttersprache
Russisch
Gut
Französisch
Grundlagen