Kushagra Kapoor

Angestellt, Sub-Project Manager- HVDC Equipment, SIEMENS

Gurgaon, Indien

Über mich

I am an Electrical Engineer, currently working in field of HVDC component engineering for past 6 years, working on projects for Siemens AG (now Siemens Energy). In my current role as HVDC engineer, I have worked on execution of three HVDC Station projects in India and Overseas; and I am currently involved in execution of a Grid Access HVDC Projects. I have worked on AIS, GIS and AC/DC High Voltage Switchyard Equipment. My current role requires me to be agile and aware about the changes in the standards and specification, as well as be aware of contract management exercises. My area of interest includes HVDC, Grid Integration of Renewables, GIS, Transformers, Surge Arrestors, FACTS, Energy Markets and High Voltage technologies. I also have two years of work experience as a Project Engineer in execution of Air Insulated Substations with Siemens Ltd. in India, as a part of project team responsible for engineering and project execution of two AIS substations.

Fähigkeiten und Kenntnisse

Project Management
Grid Integration
FACTS
High Voltage
Renewable Energy
HVDC/HGÜ
Elektrotechnik
Ingenieur
Engineering
Energie

Werdegang

Berufserfahrung von Kushagra Kapoor

  • Bis heute 8 Jahre und 3 Monate, seit Apr. 2016

    Sub-Project Manager- HVDC Equipment

    SIEMENS
  • 2 Jahre und 1 Monat, Juli 2011 - Juli 2013

    Executive Engineer

    SIEMENS

    Engineering Co-ordination, Procurement and Data Handling, Client Co-ordination for Projects: PGCIL Angul 765/400kV pooling substation, 400kV GMR Kamalanga Energy Ltd. Extension and 400kV JITPL Extension, Angul at Angul, Orissa, India

  • 6 Monate, Jan. 2011 - Juni 2011

    Intern/Trainee

    National Institute of Solar Energy( previously Solar Energy Centre)

    The work included Standard Test Condition (STC) of Solar PV panels as per IEC 61215, Assisting in setting up of 25kWp feeder sub-station for local off-grid network, Study of MPPT assisted systems.

  • 2 Monate, Juni 2009 - Juli 2009

    Student Trainee

    NTPC Ltd

    Six week training including study of working of thermal plants, operation of Switchgears and understanding principles of generator systems and turbine.

Ausbildung von Kushagra Kapoor

  • 2 Jahre und 5 Monate, Okt. 2013 - Feb. 2016

    Electrical Power Engineering

    RWTH Aachen University

    High Voltage Technology, Automation of Complex Power Systems, Modern Control Systems, Power System Dynamics, Battery Storage Technologies.

  • 2007 - 2011

    Electrical Engineering

    Thapar University

Sprachen

  • Deutsch

    Grundlagen

  • Englisch

    Fließend

Interessen

Music
Reading
Graphic Designing
Photography
Travelling
Cycling

21 Mio. XING Mitglieder, von A bis Z