Federico Arrighetti
Angestellt, Chief Expert Automotive Safety, Elektrobit Automotive GmbH
Munich, Deutschland
Werdegang
Berufserfahrung von Federico Arrighetti
Bis heute 1 Jahr und 7 Monate, seit Dez. 2022
Chief Expert Automotive Safety
Elektrobit Automotive GmbH4 Jahre und 11 Monate, Jan. 2018 - Nov. 2022
Certification and Safety Manager
CT Software Engineering GmbH
Consultant at Knorr-Bremse
1 Jahr und 5 Monate, Aug. 2016 - Dez. 2017
Safety Engineer EMO (Engineering Management Office) at Banedanmark DK
Parsons Group International Ltd
Consultant at Banedanmark (Danish Railway Company) for the safety activites related to the installation of ERTMS Level 2 on the entire Danish railway network
5 Jahre, Aug. 2011 - Juli 2016
Product Manager (SmartIO)
Alstom Transport UK (formerly Signalling Solutions Ltd)
Product Manager for the introduction of the SmartIO product developed by Alstom on the UK market
4 Jahre und 1 Monat, Juli 2007 - Juli 2011
Safety Assurance Team Leader
Invensys Rail (UK)
Responsible for the safety assurance of the DTG-R system (Distance To Go-Radio), an Automatic Train Control system intended for being used in metros and sub-surface lines; the system is SIL4 according to CENELEC standards; the Assessor is Lloyd’s Register Rail (London)
9 Monate, Nov. 2006 - Juli 2007
Leader Assessor - Technical Responsible
Sciro S.p.A. (Italy - Notified Body Directives 96/48CE and 2001/16CE)
Responsible for assessment activities of safety-critical railway signalling systems according to CENELEC standards.Independent Safety Assessment, according to CENELEC standards, of the trainborne subsystem developed by Ansaldo Segnalamento Ferroviario S.p.A. (“Generic Product” and “Generic Application”); the trainborne subsystem implements both ERTMS Level 2 and Italian signalling system “SCMT”; the trainborne subsystem is a SIL4 system according to CENELEC standards.
2 Jahre und 3 Monate, Sep. 2004 - Nov. 2006
Verification & Validation and Safety Manager
Mer Mec S.p.A. (italy)
Responsible for the certification (according to the CENELEC standards) of the trackside part of the Automatic Train Control system “SCMT” developed by Mer Mec S.p.A. for R.F.I. S.p.A. (Italian railways); the Assessor was R.F.I. S.p.A. (Italian Railways) supported by SciroTÜV (Genova - Italy; SciroTÜV is a consortium between the Italian company Sciro s.r.l. and the Italian subsidiary of Rheinland TÜV - Germany) and by RINA S.p.A. (Genova - Italy); the system “SCMT” is a SIL4 system according to CENELEC; the
1 Jahr und 6 Monate, Apr. 2003 - Sep. 2004
Consultant - Project Leader
Intecs S.p.A (Italy)
Direction and coordination of all the activities related to the certification according to the CENELEC standards of the radio remote control system “Locomote” produced by Åkerströms Björbo AB (Björbo - Sweden) intended for being used in railway domain; the Assessor was TÜV Automotive GmbH (Munich - Germany); the system “Locomote” is a SIL3 system according to CENELEC. The job is executed both in Italy and in Sweden.
8 Monate, Mai 2003 - Dez. 2003
Consultant - Project Leader
Intecs S.p.A. (Italy)
Support to Alstom Transport S.p.A. for developing a technical proposal and an example of a new version of the System Requirements Specification document intended for being used as a Customer Specification document by R.F.I. S.p.A. (Italian railways).The System Requirements Specifications document is written according to CENELEC standards and relates to the on board subsystem of the Italian implementation of the European system ERTMS developed by Alstom Transport S.p.A.
4 Monate, Nov. 2002 - Feb. 2003
Consultant - Project Leader
Intecs S.p.A. (Italy)
Support to Alstom Transport S.p.A. (an Italian subsidiary of Alstom) in order to define the documentation plan and the lifecycle of the Alstom implementation of the on-board part of the Automatic Train Control system “SCMT” developed by Alstom Transport S.p.A. for R.F.I. S.p.A. (Italian railways); the Assessor was TÜV Automotive GmbH (Munich - Germany). The system “SCMT” is a SIL4 system according to CENELEC
7 Monate, Mai 2002 - Nov. 2002
Consultant - Project Leader
Intecs S.p.A: (italy)
Support to Alstom Transport S.p.A. (an Italian subsidiary of Alstom) in order to write the high level documentation of the MMI (Man Machine Interface) subsystem for the Certification according to the CENELEC standards of the on-board part of the Automatic Train Control system “SCMT” developed by Alstom Transport S.p.A. (an Italian subsidiary of Alstom) for R.F.I. S.p.A. (Italian railways); the Assessor was TÜV Automotive GmbH (Munich - Germany); the MMI is a SIL4 system according to CENELEC:
5 Monate, Jan. 2002 - Mai 2002
Consultant - Project Leader
Intecs S.p.A. (Italy)
Reviewing all the documentation set and of the lifecycle related to the acceptance by R.F.I. S.p.A. (Italian railways) of the electronic device D-BCA/CCS (Axle Counter) developed by Ducati Sistemi S.r.l. (Italy) in order to make it compliant to CENELEC standards; the D-BCA/CCS is intended for detecting the presence of a train on a track and for managing a safe communication between two adjacent stations. The “D-BCA/CC is a SIL4 system according to CENELEC.
11 Monate, Feb. 2001 - Dez. 2001
Consultant - Test Engineer
Intecs S.p.A. (Italy)
Design and execution and documentation of the software tests of the vital software component “Physical I/O” (C-language) for the certification according to the CENELEC standards of the Automatic Train Control “Microlok II” developed by Union Switch and Signal (Pittsburgh - Pennsylvania - USA) for the automatic driverless Copenhagen Metro; the Assessor was TÜV InterTraffic GmbH (Cologne - Germany); the “Microlok II” is a SIL4 system according to CENELEC:
Ausbildung von Federico Arrighetti
15 Jahre und 7 Monate, Okt. 1982 - Apr. 1998
Ingegneria Elettronica (Telecomunicationi)
Università degli Studi di Pisa
Sprachen
Englisch
Fließend
Französisch
Fließend
Italienisch
Muttersprache