Cezar Frank Freire Lombardi
Bis 2014, Mechanical Engineer, CIPETRAN - Organism of safety vehicle inspection
Rio de janeiro, Brasilien
Werdegang
Berufserfahrung von Cezar Frank Freire Lombardi
2 Jahre und 11 Monate, Okt. 2011 - Aug. 2014
Mechanical Engineer
CIPETRAN - Organism of safety vehicle inspection
Inspections in light vehicles, until 7.000 tons, for the issuance of the Certificate of Vehicle Safety INMETRO. Working with: vehicle modified by single vehicle manufacturer, vehicles with methane gas installed inspection, vehicle recovered from theft inspection and collision, companies that manufacture and processing of vehicles and CAT (Transit Authorization Certificate) /WIN registration in Brazil. Quality audit internal and external oversight and maintenance of inspection equipment.
2 Jahre und 7 Monate, Juni 2008 - Dez. 2010
Site manager
Condominium Mandala
Work of Reform of a Front (Area =13.000 m2 (three blocks-220 apartments) in porcelain tablet and gray granite for window sill) of the Condominium Mandala -Project Value= U$ 1.028.572, 00- (1 Real=1, 75 in 09-12-09) -To accompany the process of recruiting of the executive construction company; -Elaboration detailed planning of the work establishing the plans of Supply and Execution; -Physical-financial control, choice of the builder, sale-and-leaseback of materials and choice; -Supervising, attendance, t
5 Monate, Apr. 2007 - Aug. 2007
Site manager
CORIO Organization Committee of the Pan-American Games of Rio of January 2007
SUPERVISING THE WORKS OF FACILITIES, OVERLAY (TEMPORARY INSTALLATIONS FACILITIES), OF THE MARACANÃ’S COMPOUND (MARIO FILHO STADIUM (FOOTBALL), CÉLIO DE BARROS (ATHLETICS), MARACANÃZINHO (BASKETBALL AND VOLLEYBALL) AND JULIO DELAMARE (AQUATICS)) AND RESPONSIBLE FOR THE INTER-MEDIATION BETWEEN THE AMERICANS ,GERMANY, AUSTRALIANS AND ENGLISH OF THE RIO 2007 PAN AMERICAN GAMES OPEN AND CLOSED CEREMONIES AND WITH THE OVERLAY(TEMPORARY CONSTRUCTION AND THE CONSTRUCTORS),OVERLAY (FACILITIES). After the Games,
10 Monate, Nov. 2004 - Aug. 2005
Mechanical Engineer
COTRAN - Controle de Transportes Ltda. (OIC-SV-Organism of vehicle inspection to
DID THE MECHANISM OF SEARCH (NORMS AND REGULATIONS ACCORDING THE VEHICLE INPECTION PROCEDURES) AT THE SITE OF THE COMPANY, ORGANIZATION OF THE LEGISLATION, NORMS OF ABNT (WWW.ABNT.ORG.BR) AND TECHNICAL REGULATIONS OF INMETRO* FOR CONSULTATION FOR THE VISITORS OF THE SITE OF THE COMPANY AND ELABORATION OF THE QUALITY INTERN AUDIT. *Metrology Institute of Brazil
10 Monate, Nov. 2003 - Aug. 2004
Technical Manager/Mechanical Engineer
Libertec- (OIC-SV -Organism of vehicle inspection to propagate credential for IN
Advisor, training, control and manager.
1 Jahr und 4 Monate, Juli 2002 - Okt. 2003
Technical Manager/Mechanical Engineer
INSPECENTER www.inspecenter.com.br (OIC-SV -Organism of vehicle inspection to pr
Departamento: Otro, We coordinate the inspection in light vehicles for emission of the Certificate of Security to propagate of the INMETRO. (We coordinate a group of 10 people). Working with the norms: RTQ 25(towing), Transformed 24(vehicles RTQ), Norm 102(vehicles with GNV=vehicles with natural gas), and NIE_DINQP 97(recovered of robbery and collision). We gave consult to make possible, the homologation for the INMETRO. Assisting in the part Technique and the document, confection the manual of quality for
1 Jahr und 7 Monate, Dez. 2000 - Juni 2002
Manager Technician /Responsible engineer
CIPETRAN - Centro de Inspeção e Pesquisa Em Transportes LTDA. (OIC-SV-Organism o
Departamento: Otro, Homologation of companies Manufacturers Transforming of vehicles, homologation of converted company of vehicles for use in Gas Methane To propagate (In all Brazil, already having homologated 30 companies that install gas methane in BHAIA, EPÍRITO SANTO, SÃO PAULO, MINAS GERAIS and PÁRANA) and inspection in light and heavy vehicles for emission of the Certificate of Security To propagate of light vehicles and heavy of the INMETRO. (It coordinated a group of 15 people). Working with the no
Ausbildung von Cezar Frank Freire Lombardi
2005 - 2006
- UGF - University Gama Filho-www.ugf.br
Project Management - UGF - University Gama Filho Type of course: post-graduation. www.gestaodeprojetos.com.br/gpa Beginning: 04/04/2005 Ending in: 20/11/2006 Statuses: Concluded Thesis: A MODEL OF THE PROCESS OF CERTIFICATION, BASED ON THE PRACTICES OF PMI (PROJECT MANAGEMENT INSTITUTE), IN ACCREDI
1986 - 1996
- UGF - University Gama Filho-www.ugf.br
Engineering Mechanics - UGF - University Gama Filho-www.ugf.br Type of course: Bachelor-Superior (university) Beginning: 10/06/1986 Ending in: 20/06/1996 Statuses: Concluded Load: 10 semesters Comments: mechanical engineer (plain), hard area. The course was taken in six and a half years not
1979 - 1985
- UGF - University Gama Filho-www.ugf.br
Course: Architecture and Town Planning - UGF - University Gama Filho-www.ugf.br Type of course: Bachelor-Superior (university) Beginning: 10/06/1979 Ending in: 20/06/1985 Statuses: Concluded Load: 10 semesters
Sprachen
Englisch
-
Portugiesisch
-