Carlos Esteban Alfonso

Angestellt, Reservoir Engineer leader, Parex Resources

Bogota, Kolumbien

Werdegang

Berufserfahrung von Carlos Esteban Alfonso

  • Bis heute 7 Jahre und 5 Monate, seit Feb. 2017

    Reservoir Engineer leader

    Parex Resources

    -Coordination of the reservoir engineering technical plans and operative/monitoring of the current in-development fields -Leader of the Colombian reservoir group for new Opps analysis and development. -Evaluation of corporate reserves. -Reservoir simulation and modeling -Monitoring to waterflooding projects. -Evaluation of EOR opportunities for projects with low reserves but high levels of contingent resources. -Pressure Transient Analysis -Colciencias Research Project.

  • 5 Jahre und 6 Monate, Apr. 2011 - Sep. 2016

    Reservoir Engineer

    Emerald Energy

    -Assets development and Reservoir management, characterization, 3Dmodelling, reservoir simulation. -Accountability and evaluation of the corporate Reserves & Resources (Data gathering, Volumetric evaluation, Development Plans evaluation - Production forecasting, Static & Dynamic model , Economical evaluation, validation of results of third party companies) -Reservoir Simulation -New prospects evaluation. -PBU interpretation & Nodal Analysis

  • 1 Jahr und 6 Monate, Sep. 2009 - Feb. 2011

    Reservoir Engineer

    Schlumberger

    -Reservoir simulation and production simulation of the Casabe field. In charge of building the model for the waterflooding design. -Leader in the optimization of the vertical efficiency of injectivity in the Selective string wells/injection wells. -Follow up to the waterflooding project. -Complete nodal Analysis for ALS design and Reservoir management optimization. Working in the implementation of a Frictional factor for the injection wells in the software of Schlumberger

  • 11 Monate, Nov. 2008 - Sep. 2009

    Reservoir Engineer Researcher

    Schlumberger

    -Responsible for creating a model which gives a solution of the low reservoir injectivity in some intervals in the selective string wells in Casabe oilfield. This research allows to create a methodology to design fixed hole size in WFR, and conclude in a new equation of Darcy flow including a parameter of Inertial Friction Coefficient, through the match of the logs.

  • 8 Monate, Jan. 2008 - Aug. 2008

    Reservoir Engineer Asistant

    Schlumberger

    -In charge of the support and evaluation of the electric logs, XPT (Pressure test), and MDT, in order to determine the intervals to be perforated and its productivity. It included a software programmation to determine the total productivity for the three formations (Colorado, Mugros y La Paz) -Supporting the injection models and determination of the number and MD of the packers for the selective string in order to maximize the vertical efficiency.

Ausbildung von Carlos Esteban Alfonso

  • 6 Jahre und 2 Monate, Juli 2003 - Aug. 2009

    Petroleum engineering

    Universidad de América

Sprachen

  • Englisch

    Fließend

  • Spanisch

    Muttersprache

  • Deutsch

    Grundlagen

21 Mio. XING Mitglieder, von A bis Z