Dipl.-Ing. Alex Talmon-l'Armee

Angestellt, Senior Technical Director, NIRAS

Cairo, Ägypten

Fähigkeiten und Kenntnisse

Architecture
civil engineering
disaster management
International Development
Emergency Response
Disaster Recovery
Damage Analysis
Infrastructure
Site management
Assessment
Vulnerability Assessment
Risk Management
Natural Disasters and Hazards
International Project Management
programme management
IDS/IDP
Quality Control
Monitoring
Technical Supervision
Contract Negotiation
IT
ICT
MapInfo
MS Project
Database Design
AutoCAD
cross-platform WIN&MAC
most application software
blogging (audio/video)
video conferencing
Appraisal
Construction

Werdegang

Berufserfahrung von Alex Talmon-l'Armee

  • Bis heute 3 Jahre und 9 Monate, seit Okt. 2020

    Senior Technical Director

    NIRAS

    IFE financed by KfW for 8 African countries. Côte d‘Ivoir, Egypt, Ethiopia, Ghana, Morocco, Rwanda, Senegal, Tunesia

  • 1 Jahr und 7 Monate, März 2019 - Sep. 2020

    Team Leader

    GOPA Infra GmbH

  • 1 Jahr, März 2018 - Feb. 2019

    Senior Engineer - Education Sector

    European Investment Bank (EIB)

    - evaluate technical aspect of knowledge infrastructure projects in the education sector - promote the understanding of the main issues and challenges of the education sector to key decision makers in the Bank and to present the Bank’s contribution to the interested outside world, including the European Commission and other international bodies and peer groups concerned with the sector. - Prepare comparative cost studies (including methodology, strategy and sector perspectives)

  • 5 Monate, Okt. 2017 - Feb. 2018

    Team Leader – Key Expert for Infrastructure Reconstruction

    GOPA Consultants

    Technical Support (‘quick win measures’) for roads & bridges for the German Credit Facility for Iraq (KfW) to Assist the Return of IDPs: a) ReFAATO & Ministry of Construction, Housing (MoCH) to support the procurement of rehabilitation works (including bidding documents) for bridges & roads in the Nineveh Governorate (Mosul area); b) Investment Plan for Road Infrastructures for immediate implementation (~45 million Euro, first phase) and a second phase on complimentary required investments.

  • 1 Jahr und 4 Monate, Juni 2016 - Sep. 2017

    (re)construction specialist

    Talmon-l'Armée

  • 4 Monate, März 2016 - Juni 2016

    Technical Proposal Coordinator, Renewable Energy Proposal

    UNOPS Sierra Leone

    Gov. of Sierra Leone requested the formulation of a Renewable Energy Proposal through hybrid renewable energy sources in 50-60 rural locations, ~$60 million. - multidisciplinary team of experts - UNOPS engaged a Proposal Coordinator to lead the implementation of the pre-feasibility study. He was also the key interface with key stakeholders to ensure needs and observations are appropriately taken into account in the analysis & proposal formulation. Both the PFS and the main project are funded by DFID.

  • 4 Monate, Sep. 2015 - Dez. 2015

    STE- assessment of infrastructure needs & preparation of technical designs, PNG

    GFA Consulting Group

    Preparation of tender documents for 12 TVETs in six provinces. HRDP2, a programme of the Gov. of Papua New Guinea (PNG), funded by the European Union (EU) under the 10th European Development Fund (EDF), with a total budget of € 26 million, approx., half of which is foreseen to be spent on infrastructure, equipment and materials; overall objective is to reinforce the vocational stream of education at lower secondary level in order to promote the development of skilled labour force.

  • 3 Monate, Juli 2015 - Sep. 2015

    Consultant Senior Engineer, Khartoum, Sudan

    UNOPS Sudan

    Technical audit of 12 infrastructure projects for UNOP’s Sustainable Infrastructure Practice Group (SIPG) A key objective for UNOPS is to be recognized as delivering world-class infrastructure even in the most challenging environments such as Sudan), where it has implemented annually USD 12.5 million.

  • 6 Monate, Jan. 2015 - Juni 2015

    project manager; UNDP; Green ONE UN House GOUNH; Hanoi, Vietnam

    UNDP United Nations Development Programme

    The Green UN House, ~7800 m2, 6 floors, workspace for 400 people, designed and constructed in conformity with Vietnamese construction codes and highest international standards for quality control and quality assurance. Project Manager critical to ensuring that the design and construction phase of the project, including the eco-friendly and team-friendly design aspects of the UN House are realized successfully and PRINCE 2 methodology is applied.

  • 2 Jahre, Jan. 2013 - Dez. 2014

    Team Leader & Rural Infrastructure Engineer; MPP9; Nigeria

    Louis Berger

    Supervise 10 civil engineers in Decentralised Management Units (DMUs) Training and maintenance of quality and standards in projects, development of standard Bills of Quantity for infrastructure work. Preparation of tender dossiers. Supervision & provisional acceptance of 764 building projects & coordination of the monitoring of infrastructure. Carrying out of regular ‘on the spot’ assessments of projects. Act as Imprest Administrator of Programme Estimate.

  • 3 Monate, Okt. 2012 - Dez. 2012

    Evaluation expert, Mid-Term Evaluation of UNRWA Medium Term Strategy; Palestine

    TRANSTEC

    Mid-Term Evaluation of the UNRWA Medium Term Strategy (MTS)

  • 3 Monate, Okt. 2012 - Dez. 2012

    Rural Infrastructure Engineer; ‘Micro Projects Programme in the Niger Delta' MPP

    GOPA Consultants

    Supervise work of engineers in Decentralised Management Units (DMUs). Training and maintenance of quality and standards in projects, development of standard Bills of Quantity for infrastructure work. Preparation of tender dossiers of all the construction contracts foreseen under the programme. Coordination of the monitoring of infrastructure in the field, regular ‘on the spot’ assessments of projects.

  • 2 Monate, Sep. 2012 - Okt. 2012

    planner; Uganda

    sabbatical

    development of private properties with housing solutions in Kampala and Fort Portal, Uganda. Including technical infrastructure such as water, electricity, sewerage; structural engineering; FIDIC red book form of contract

  • 2 Monate, Juli 2012 - Aug. 2012

    Consultant; Malawi

    KfW

    Review of the primary education facility reconstruction programmes in Malawi

  • 6 Monate, Jan. 2012 - Juni 2012

    planner; Uganda

    sabbatical

    research of housing market in Uganda, including technical infrastructure, WATSAN, FIDIC red book form of contract

  • 2 Jahre und 9 Monate, Apr. 2009 - Dez. 2011

    social infrastructure; Western Balkans Infrastructure Projects Facility IPF

    WYG International

    TA to Gov. of Western Balkans (CR, BiH, SER, CG, MAC, ALB) in the social infrastructure (edu, health, penitentiary) to develop bankable projects fit for financing by an IFI. identifying projects, writing Terms of reference, identifying, and contracting and managing consultants. all project stages, i.e. pre-feasibility, feasibility, preliminary design, main design, Bill of Quantity, and tendering (FIDIC red book (design, bid, build), pink book (MDB harmonised edition), yellow book (plant and design-build)).

  • 9 Monate, Apr. 2008 - Dez. 2008

    team leader/ project manager Papua New Guinea

    LINPICO

    Team Leader for a project to 'Improve Rural Primary Educational Facilities' in three districts in three provinces in Papua New Guinea.

  • 1 Jahr und 6 Monate, Okt. 2006 - März 2008

    Head of Mission- Iraq

    International Management Group

    Head the European Commission Technical Assistance Facility - Iraq, providing TA to the European Commission's Delegation in Baghdad.

  • 2 Monate, Aug. 2006 - Sep. 2006

    Housing & Infrastructure Specialist; mid-term evaluation; Aceh, Indonesia

    italtrend

    Evaluation of the individual projects financed by the MDF ($550 million) and of their contribution to the overall reconstruction process in Aceh and Nias.

  • 4 Monate, März 2006 - Juni 2006

    Team Leader, Palestine

    italtrend

    Conceptualize a comprehensive National Development Planning System (including Monitoring & Evaluation) for the Palestinian Authority (incl. e-government) and identify the activities and accountability of the various stakeholders within the system

Ausbildung von Alex Talmon-l'Armee

  • 1 Jahr und 1 Monat, Aug. 2000 - Aug. 2001

    Disaster Management

    Cranfield University

  • 4 Jahre und 5 Monate, Okt. 1989 - Feb. 1994

    Civil Engineering

    University of Regensburg

  • 2 Jahre, Okt. 1987 - Sep. 1989

    Architecture

    University of Regensburg

Sprachen

  • Deutsch

    Muttersprache

  • Englisch

    Muttersprache

  • Französisch

    Gut

Interessen

fly fishing

21 Mio. XING Mitglieder, von A bis Z